Flowpack holder made of stainless steel for wall mounting with automatic pressure transducer for perfect flowpack positioning, including mounting accessories. Technical data: Outer dimensions: 16 cm x 14.6 cm x 17 cm (HxWxD).Material – housing: stainless steel, brushed on both sidesMaximum flowpack height: 8 cmMaximum flowpack depth: 15 cmOpening: 12 cm x 9 cm (WxD)Logistical […]
MaiMed participates in costs Since the Mühlenhof (of the Sponsor Association Mühlenhof e.V. in Sprengel) still lacked a defibrillator until recently, we were very happy to participate in the necessary acquisition costs – now this will be permanently available in the Mühlenhof for any life-saving emergency measures!
https://maimed.de/wp-content/uploads/Blog/15102018.jpg321640admin_e8v0l70whttps://maimed.de/wp-content/uploads/2019/05/maimed-logo.pngadmin_e8v0l70w2019-08-29 17:54:232019-08-29 17:56:54Defibrillator for Mühlenhof
Six million euros invested and warehouse significantly expanded Neuenkirchen, Germany. From the Bundesstraße 71, which runs a few metres away, it is hardly visible when a construction vehicle is not driving through the field of vision: Maimed is growing. Not just a little, but strong and upwards as well. The storage capacity is to be […]
MAIMED® STAINLESS STEEL FLOWPACK HOLDER FOR WALL MOUNTING
PressFlowpack holder made of stainless steel for wall mounting with automatic pressure transducer for perfect flowpack positioning, including mounting accessories. Technical data: Outer dimensions: 16 cm x 14.6 cm x 17 cm (HxWxD).Material – housing: stainless steel, brushed on both sidesMaximum flowpack height: 8 cmMaximum flowpack depth: 15 cmOpening: 12 cm x 9 cm (WxD)Logistical […]
Defibrillator for Mühlenhof
PressMaiMed participates in costs Since the Mühlenhof (of the Sponsor Association Mühlenhof e.V. in Sprengel) still lacked a defibrillator until recently, we were very happy to participate in the necessary acquisition costs – now this will be permanently available in the Mühlenhof for any life-saving emergency measures!
MaiMed grows strongly
PressSix million euros invested and warehouse significantly expanded Neuenkirchen, Germany. From the Bundesstraße 71, which runs a few metres away, it is hardly visible when a construction vehicle is not driving through the field of vision: Maimed is growing. Not just a little, but strong and upwards as well. The storage capacity is to be […]